25 Nov Aria Reserve North Edgewater Condos: Prices, Construction Status and Sources (2026)
Aria Reserve North Edgewater Condos: Prices, Construction Status and Sources (2026)
Aria Reserve North is a condominium at 725 NE 24th St in Edgewater, Miami, with residences listed $1.15 million to $4.49 million. Temporary certificate of occupancy reported in 2026; details below come from the dated sources listed at the end of this page.
Buying in this building? Request a document review.
Tell us which residence interests you and what information you need. We'll help identify the relevant inspection reports, Structural Integrity Reserve Study (SIRS), association budget, reserve information and disclosed special assessments, subject to availability and access. We can also help you explore available residences and identify additional information to request before making an offer.
Request a document reviewMark Sandulli · Dave Jones Realty
Thinking Of Buying Or Selling Here?
Leave your name, email and phone. It goes straight to Mark, in confidence.
Mark Sandulli, Real Estate Salesperson, licensed in Connecticut (RES.0808170) and Florida (SL3216860). Dave Jones Realty LLC, 40 Center St, Prospect, CT 06712. Cell 954-839-7406 · mark@davejonesrealty.com
Aria Reserve North at a Glance
| Address | 725 NE 24th St |
|---|---|
| Status | Temporary certificate of occupancy reported (October 2026) |
| Stories | 62 |
| Residences | 399 (a 2022 report listed 363) |
| Developer | Melo Group (also the general contractor) |
| Architect | Arquitectonica |
| Listed prices | $1.15 million to $4.49 million (as of November 23, 2026) |
Thinking of buying or selling here? Ask Mark, South Florida Realtor with Dave Jones Realty LLC ↓
Construction Status
Florida YIMBY reported on April 6, 2026 that work was nearing completion on the North Tower of Aria Reserve, a 62-story tower with 399 condos at 725 NE 24th Street, with delivery expected in the second quarter of 2026. Resident reported on October 6, 2026 that the North Tower had received its temporary certificate of occupancy. As of November 25, 2026, Miami-Dade County Property Appraiser records did not yet list a condominium for the North Tower, so year built and unit count are not in county records yet.
Neighborhood
The City of Miami neighborhood map (checked November 25, 2026) does not yet list 725 NE 24th St; its twin, Aria Reserve South at 700 NE 24th St, is mapped in Edgewater.
In the News
- Nearing completion; delivery expected in the second quarter of 2026 (Florida YIMBY, April 6, 2026).
- Temporary certificate of occupancy reported (Resident, October 6, 2026).
Milestone Inspections and Reserves
Florida’s milestone inspection law applies to condo buildings of three or more habitable stories once they reach 30 years, or 25 years where the local enforcement agency requires it based on local circumstances such as proximity to salt water, and every 10 years after that. Associations of these buildings must also complete a structural integrity reserve study (SIRS) at least every 10 years (Florida Statutes s. 718.112). Before you buy, ask for the budget, the reserve schedule, the latest reserve study and the turnover date from the developer to the owners.
- The milestone inspection summary, if the building has had a milestone inspection (ask for any Phase 2 report too)
- The most recent structural integrity reserve study, or a statement that none has been completed
- The annual budget and financial statement, plus the reserve balance and any special assessments
- Board minutes from the past year, for planned repairs
For a resale, Florida law (section 718.503(2)) entitles the buyer, at the seller’s expense, to the declaration, articles, bylaws and rules, annual financial statement and budget, Q&A sheet, milestone inspection summary (if applicable), the most recent SIRS or a statement that none exists, and any turnover inspection report. Unless the buyer received them more than 7 days before signing, the buyer may cancel within 7 days (excluding weekends and legal holidays) after signing and receiving them, until closing. A buyer purchasing from the developer has 15 days (section 718.503(1)). Board minutes, reserve balances and special-assessment details are not on the statutory list; request them separately. Read our complete guide to Florida condo milestone inspections and SIRS.
Full list: see our Florida condo due diligence checklist, with every document to get before you sign and the Florida statute behind each one.
Own a residence here?
Florida's reserve and inspection rules can affect condo values. Get a confidential valuation based on today's market and your building's status.
Get my free valuationThinking of selling at Aria Reserve North? Mark Sandulli, Realtor with Dave Jones Realty LLC, tracks the listings and building records at Aria Reserve North, one of hundreds of condo buildings he follows across South Florida, and can prepare a free comparative market analysis (CMA) for your residence. Call or text 954-839-7406.
Buying at Aria Reserve North? Mark can send you new listings, price changes and recent sales here, along with the building’s inspection and reserve status, so you know what you’re buying into.
Frequently Asked Questions
How much does a condo at Aria Reserve North cost?
Residences are listed $1.15 million to $4.49 million as of November 23, 2026.
Is Aria Reserve North finished?
Resident reported a temporary certificate of occupancy on October 6, 2026. Ask the sales team for the certificate and the closing schedule.
How many residences are at Aria Reserve North?
399, per Florida YIMBY (April 6, 2026). Miami Today listed 363 in 2022.
More Edgewater Luxury Condos
- Edgewater luxury condos: every building from $1M
- Villa Miami Edgewater condos
- The Cove Residences Edgewater condos
- HQ Residences Miami Edgewater condos
- South Florida condos: building guides by town
- Florida condo milestone inspection and SIRS guide
Sources (6) · Click to View
- Florida YIMBY, April 6, 2026: floridayimby.com
- Resident, October 6, 2026: resident.com
- Miami Today, June 14, 2022: www.miamitodaynews.com
- City of Miami GIS, Neighborhood map, checked November 25, 2026: gis.miami.gov
- Florida Statutes s. 553.899 (milestone inspections), checked November 22, 2026: www.leg.state.fl.us
- Florida Statutes s. 718.112 (structural integrity reserve studies), checked November 25, 2026: www.leg.state.fl.us
Last updated November 25, 2026. Building details come from county property records, public listings and government sources and are deemed reliable but not guaranteed. Prices are asking prices or estimates as of the date shown. Not legal, financial or engineering advice. Full disclaimer
Join the Everything Luxury Insider
One email a week, every Thursday: the best of South Florida, from new restaurants and openings to weekend events, new developments and our newest guides. Free. We never sell or share your details, and you can unsubscribe anytime.
We’ll email you once to confirm. See our privacy policy.
Mark Sandulli · Dave Jones Realty
Thinking Of Buying Or Selling Here?
Leave your name, email and phone. It goes straight to Mark, in confidence.
Prefer an instant estimate? Get a free report at HomeValueReportFree.com.
Mark Sandulli, Real Estate Salesperson, licensed in Connecticut (RES.0808170) and Florida (SL3216860). Dave Jones Realty LLC, 40 Center St, Prospect, CT 06712. Cell 954-839-7406 · mark@davejonesrealty.com
