You can still sell a unit in a 30-plus-year-old coastal condo building in South Florida, but buyers and lenders now expect to see the building’s milestone inspection and structural integrity reserve study (SIRS), so the sale goes best when you have those reports in hand before you list. Under current Florida law, a condo building three habitable stories or taller needs a milestone inspection by December 31 of the year it turns 30, then every 10 years. Owner-controlled associations that existed on or before July 1, 2022 had to finish a SIRS by December 31, 2025. If a resale buyer does not receive the required documents, including the milestone summary and SIRS, more than 7 days before signing, the buyer can cancel within 7 days (excluding weekends and legal holidays) after signing and receiving them, until closing.

Figures and rules below come from the sources listed at the end, checked November 26, 2026. They change; confirm details with your own attorney, tax adviser and lender. Nothing here is legal, tax or financial advice.

At a Glance

Topic Current Rule (as of November 2026) Where It Comes From
Milestone inspection trigger Buildings three habitable stories or more; due by December 31 of the year the building turns 30, then every 10 years Fla. Stat. 553.899(3)(a)
Coastal buildings No automatic 25-year rule; the local building agency may require 25 years based on conditions such as proximity to salt water Fla. Stat. 553.899(3)(b); changed by 2023 SB 154
Repairs after phase two Must begin within 365 days of receiving the phase two report Fla. Stat. 553.899(11)
SIRS deadline December 31, 2025 for owner-controlled associations existing on or before July 1, 2022; one combined with a milestone inspection due by December 31, 2026 may be finished with it, but never after December 31, 2026. Fla. Stat. 718.112(2)(g)7
Waiving structural reserves Not allowed for SIRS items in budgets adopted on or after December 31, 2024 Fla. Stat. 718.112(2)(f)2.b
Reserve pause Up to two consecutive annual budgets, if a milestone inspection was completed in the prior two calendar years, to fund its recommended repairs, with a majority vote, for budgets adopted on or before December 31, 2028 Fla. Stat. 718.112(2)(f)2.e
Buyer’s cancel window 7 days, excluding Saturdays, Sundays and legal holidays Fla. Stat. 718.503(2)(d) and (e)
Conventional lending Fannie Mae treats projects needing unaddressed critical repairs as ineligible Fannie Mae Selling Guide B4-2.1-03

Thinking of buying or selling here? Ask Mark, South Florida Realtor with Dave Jones Realty LLC ↓

What the Milestone Inspection Law Requires Now

Florida’s milestone inspection law is section 553.899 of the Florida Statutes. It applies to condo and co-op buildings that are three habitable stories or more in height. The first inspection is due by December 31 of the year the building reaches 30 years from its certificate of occupancy. After that, it repeats every 10 years.

The 25-Year Coastal Rule Changed

The original law set a 25-year deadline for buildings within three miles of the coastline. In 2023, SB 154 deleted that automatic rule. Today, the statute lets the local enforcement agency require an inspection by December 31 of the year a building turns 25 if local conditions justify it, including proximity to salt water. Ask the association whether your building is on a 25-year or 30-year schedule.

Phase One and Phase Two

Phase one is a visual examination of the building by a licensed engineer or architect. If the inspector finds no substantial structural deterioration, phase two is not required. If the inspector does find it, phase two follows and may involve destructive or nondestructive testing. Repairs found in phase two must begin within 365 days after the association receives that report.

The inspector must provide a separate summary of the material findings and recommendations. Within 45 days of receiving the report, the association must distribute the summary to owners. That summary is the document your buyer will ask for.

Structural Integrity Reserve Studies and the End of Waived Reserves

The SIRS rules are in section 718.112(2)(g). A SIRS is required for each building three habitable stories or higher. It covers the roof, structure and load-bearing elements, fireproofing and fire protection, plumbing, electrical, waterproofing and exterior painting, windows and exterior doors, and other items costing more than $25,000 (adjusted for inflation) whose failure would affect those items. Buildings less than three stories are exempt, as are single-family through four-family dwellings with three or fewer habitable stories above ground.

Associations that existed on or before July 1, 2022 and are controlled by unit owners had to finish a SIRS by December 31, 2025. A SIRS combined with a milestone inspection due by December 31, 2026 may be finished with it, but never after December 31, 2026. It must be redone at least every 10 years.

The bigger change for sellers is funding. For budgets adopted on or after December 31, 2024, an owner-controlled association that must have a SIRS may not vote to provide no reserves, or less than required, for SIRS items. Owners can still waive or reduce reserves for non-SIRS items by a majority of total voting interests.

What Changed in 2024 and 2025

2024: HB 1021

HB 1021 was signed June 14, 2024 (chapter 2024-244) and took effect July 1, 2024. According to the House’s final analysis, it required associations to give owners a copy of the SIRS, or notice that it is available, within 45 days of receiving it. It also had the state create a website database of associations that completed their SIRS and exempted a four-family dwelling with three or fewer habitable stories from the milestone requirement.

2025: HB 913

HB 913 was signed June 23, 2025 (chapter 2025-175), and most of it took effect July 1, 2025. According to the Florida Senate’s bill summary, it:

  • Extended the SIRS deadline from December 31, 2024 to December 31, 2025.
  • Limited milestone inspections and SIRS to buildings three habitable stories or more.
  • Allowed a board, with majority owner approval, to pause or reduce reserve contributions for up to two consecutive annual budgets if a milestone inspection was completed in the prior two calendar years, to fund its recommended repairs. The current statute requires a SIRS before contributions resume.
  • Allowed associations to delay a SIRS for two budget years after a milestone inspection.
  • Allowed reserves to be funded by special assessment, line of credit or loan with majority approval. An owner-controlled association that must have a SIRS may also set up a line of credit or loan for milestone or SIRS-related costs.
  • Required repairs to begin within 365 days after a phase two report.

Florida Realtors also reported in June 2025 that the law requires associations to post 12 months of approved board minutes on their websites, which can show buyers proposed special assessments.

What You Must Give Your Buyer

Section 718.503(2) covers resales by owners. The buyer is entitled, at the seller’s expense, to current copies of the declaration, articles, bylaws and rules, the annual financial statement and budget, the FAQ document, and:

  • The inspector-prepared summary of the milestone inspection report, if applicable.
  • The association’s most recent SIRS, or a statement that one has not been completed.
  • The turnover inspection report, if one was done on or after July 1, 2023.

The contract must include a clause on these documents. If the buyer gets them more than 7 days (excluding weekends and legal holidays) before signing, the buyer acknowledges receipt. If not, the contract is voidable by the buyer with written notice within 7 days after signing and receiving the documents. For resale contracts entered into after December 31, 2024, a similar clause covers the milestone summary, turnover report and SIRS when the association has completed them. The right to cancel ends at closing.

The association’s estoppel certificate, under section 718.116(8), lists all assessments, special assessments and other money owed on the date it is issued. A new owner is jointly and severally liable with the prior owner for unpaid assessments, so buyers and title companies read it closely.

How Lenders Treat Older Condo Buildings

Conventional loans that lenders sell to Fannie Mae must meet its condo project rules. Fannie Mae’s Selling Guide section B4-2.1-03, last updated November 4, 2026, lists projects needing critical repairs as ineligible. Examples include material deficiencies that could lead to failure of a critical system within one year, mold or water intrusion, advanced physical deterioration, failing a mandatory jurisdictional inspection, and unfunded repairs of more than $10,000 per unit that should be done within 12 months. Routine repairs funded through the budget or a compliant special assessment are not treated as critical.

If a structural or mechanical inspection was completed within three years of the lender’s review, the lender must get and review it. If it shows unaddressed critical repairs, the project stays ineligible until the work is done and documented, and an engineer’s report confirms the concerns are resolved.

Review rules also tightened in 2026. Florida Realtors reported in May 2026 that Fannie Mae and Freddie Mac retired their limited and streamlined review options, so for loan applications dated on or after August 3, 2026, most projects need a full review. The same report said reserve funding expectations rise from 10% to 15% of annual budgeted income beginning with applications dated on or after January 4, 2027, according to trade press reports.

What the Market Data Shows

Miami Realtors reported in December 2025 that, year to date through November 2025, Miami-Dade condos in buildings 30 or more years old averaged 66 days on market, compared with 81 days for buildings 29 years or newer. For all existing Miami-Dade condos in July 2026, Miami Realtors reported sales up 11.4% year over year (921 to 1,026), a median price down 1.48% (from $406,000 to $400,000), a median of 125 days to sale and 12 months of inventory, which it called a buyer’s market.

Statewide, Florida Realtors reported 7,179 condo and townhouse sales in September 2026, a median price of $293,500 (down 1.8% year over year) and 7.7 months of supply.

Practical Moves for Sellers

Get the Building’s Reports Early

Request the milestone summary, the full report if available, the SIRS, the current budget, recent board minutes and a list of any approved or proposed special assessments. Having them at listing lets the buyer’s review start right away.

Price From Recent Sales in Your Building

Look at recent recorded sales in your building and similar nearby buildings, adjusting for floor, view and condition. Two similar units may sell differently if one building has finished its repairs and the other has not.

Decide Who Pays a Pending Assessment

Under section 718.116(1)(a), an owner is liable for assessments that come due while he or she owns the unit. A pending or planned assessment is negotiable in the contract. Options include paying it at closing, giving a credit or adjusting the price. Have your attorney put the agreement in writing.

Check Financing Before You List

Ask a lender whether the building currently meets Fannie Mae’s project standards. If it does not, buyers may need cash or a loan that does not follow Fannie Mae rules, so factor that into pricing and timing.

Questions to Ask

  1. When was the building’s certificate of occupancy issued, and is it on a 25-year or 30-year milestone schedule?
  2. Has phase one been completed, and was phase two required?
  3. If phase two found repairs, have they begun, and when are they expected to finish?
  4. When was the SIRS completed, and is the association funding reserves at the recommended level?
  5. Has the board paused reserves, or taken a line of credit or loan, and on what terms?
  6. Are any special assessments approved or proposed, and how much per unit?
  7. Does the building currently meet Fannie Mae and Freddie Mac project standards?
  8. What have comparable units in the building sold for in the past 12 months?

The Bottom Line

Florida’s condo safety laws added inspections, reserve studies and disclosures, but they did not stop sales of older oceanfront units. The sellers who do best get the reports early, know where repairs and reserves stand, price from recent sales in the building and settle who pays any assessment in the contract. Confirm the details with your attorney and a lender before you list.

More From Everything Luxury

Join the Everything Luxury Insider

One email a week, every Thursday: the best of South Florida, from new restaurants and openings to weekend events, new developments and our newest guides. Free. We never sell or share your details, and you can unsubscribe anytime.

We’ll email you once to confirm. See our privacy policy.

Sources (16) · all checked November 26, 2026
  • Florida Legislature, Florida Statutes section 553.899, milestone inspections (2026): source
  • Florida Legislature, Florida Statutes section 718.112, reserves and structural integrity reserve studies (2026): source
  • Florida Legislature, Florida Statutes section 718.503, resale disclosure (2026): source
  • Florida Legislature, Florida Statutes section 718.116, assessments and estoppel certificates (2026): source
  • Florida Senate, CS/CS/HB 913 bill history, chapter 2025-175 (approved June 23, 2025): source
  • Florida Senate, CS/CS/HB 913 bill summary (undated): source
  • Florida Senate, CS/CS/CS/HB 1021 bill history, chapter 2024-244 (approved June 14, 2024): source
  • Florida House of Representatives, HB 1021 final bill analysis (June 24, 2024): source
  • Florida Senate, CS/CS/SB 154 bill summary (2023, undated): source
  • Fannie Mae, Selling Guide B4-2.1-03, Ineligible Projects (updated November 4, 2026): source
  • Florida Realtors, Condo financing rules to change in 2026 (May 12, 2026): source
  • Florida Realtors, Realtor-supported condo bill becomes law (June 23, 2025): source
  • Miami Realtors, Miami-Dade older condominiums continue selling faster than newer units (December 19, 2025): source
  • Miami Realtors, Miami-Dade total home sales rise for 11th consecutive month, July 2026 data (August 17, 2026): source
  • Florida Realtors, September 2026 Florida condo-townhouse summary (October 2026): source
  • National Mortgage Professional, January’s condo reserve increase (2026): source

Last updated November 26, 2026. Facts come from the sources listed above, checked on that date, and may change. Not legal, financial, tax or investment advice. Full disclaimer

Mark Sandulli

Buying or selling here

Mark Sandulli

Dave Jones Realty LLC

Real Estate Salesperson, licensed in Florida and Connecticut

For more information on any luxury home in South Florida or the other places we cover, Mark is the agent to contact. He can help you buy or sell, and he can refer you to a trusted agent in other states.

Neighborhoods: Gulf Stream · Harbor Beach · Hillsboro Mile · Las Olas Isles · Manalapan · Palm Beach Estate Section · Royal Palm

Mark Sandulli: 954-839-7406 · mark@davejonesrealty.comSupervising broker, Dave Jones Realty LLC: dave@davejonesrealty.com

Mark Sandulli · Dave Jones Realty

What Is Your Condo Worth Today?

Get Mark's private pricing report, based on recorded sales in your building. Your request goes straight to Mark, in confidence.


    Mark Sandulli, Realtor with Dave Jones Realty LLC · 954-839-7406 · mark@davejonesrealty.com

    Mark Sandulli, Real Estate Salesperson, licensed in Connecticut (RES.0808170) and Florida (SL3216860). Dave Jones Realty LLC, 40 Center St, Prospect, CT 06712. Cell 954-839-7406 · mark@davejonesrealty.com